Upvote
Downvote
Epoxy Flooring Technician
Share Job
- Suggest Revision
- Your role will primarily consist of operating hand tools such as a polisher, joint saw, hand grinder, and concrete polisher.
- The shift starts between 8pm-10pm from Sunday to Friday, with occasional Saturdays.
- Operating hand tools (hand polisher, joint saw, hand grinder, concrete polisher)
- The work environment will mainly be at two remodeling sites.
- The first two job placements will be at Wal-Mart remodels in Chillicothe and London, OH. The shift is a third shift, starting between 8pm - 10pm and lasts for 8-10 hours.
Active Job
Updated YesterdaySimilar Job
Relevance
Active