Field Engineer for Airline Domain (Only Atlanta LOCALS)
Role: Field EngineerLocation: Atlanta, GA, United States (Local only)Start ASAPShifts - (largely 6-7am start (5, 8 hour days) anywhere from Sunday to Saturday. 4-week time frame)Length of Assignment:2–3 monthsSchedule & Shifts:Night shifts required10-hour or 12-hour shiftsFlexibility is essential due to changing project timelinesAt the OCC, the work consists of deinstallation of the current Zetron at 199 positions and the subsequent installation of the new system at 225 positions. The schedule of work at the OCC will depend on the final cutover plan to be determined in the next two weeks. It is currently planned as 8-hour shifts, 5 days per week, working a rotating schedule Sunday through Saturday; the start times are unknown currently but likely to be 0600.At the RCC, the equipment to be deinstalled and installed includes:1. Speakers2. Headsets3. Handsets4. USB hubs5. Cabling for the items above.6. Connection to the new media docks and jack boxes.The equipment to be deinstalled and installed at the OCC includes:1. Shelf unit to hold console2. Console workstation (W10 MoM)3. Media Dock4. ACU unit5. Jack boxes6. Cable extenders7. USB hub x28. Cable manager x29. Speakers10. Handset11. Headset12. Monitor13. Ethernet cable from port key through tray and slat wall to console workstation14. Power cabling from floor through the tray and slat wall to console workstationTools required (per Zetron instruction-tools are available on-site):1. 3/16 - Flathead Screwdriver2. 3/32 x 1 1⁄2 - Flathead Screwdriver3. #1 - Philips Screwdriver4. #0 x 1 1⁄2 - Philips Screwdriver5. 10 to 18 Gauge – Wire Strippers6. Small Diagonal Cutters7. Box Cutter8. Power Drill (Screwdriver)9. #2 square bit (Robertson) for Power DrillThe work also includes cable management, asset management, testing of each position and trash cleanup.