Upvote
Downvote
Sr Project Scheduler Hybrid Schedule
Share Job
- Suggest Revision
- Responsibilities: Lead the development of the reporting systems for project controls assignments.
- Requirements: Bachelors degree from a four-year college or university - business, finance, project management, engineering, technical, or equivalent and a minimum of 7 years of project controls scheduling experience using primavera (P6) or a minimum of 11 years of project controls scheduling experience using primavera (P6) in lieu of a degree.
- Must be proficient in primavera (p6).
- Expertise / Mastery with project management / project controls concepts / computer applications / analytics; employee development; strong collaborative team member; oversight.
- PMI or AACE certification (the following or equivalent are acceptable - PMP, CAPM, PMI-SP, AACE-CCC, AACE-PSP, AACE-CEP, AACE-EVP).
Active Job
Updated TodaySimilar Job
Relevance
Active