Upvote
Downvote
Master Scheduler (Engineering And Manufacturing)
Share Job
- Suggest Revision
Full-time
- The MPS is a planned production engineering, manufacturing, and shipment schedule, in weekly capacity-constrained sections, that is derived from outputs of the Initial Project Planning Meetings (IPM’s) and consistent discussions and coordination with Technical Project Managers (TPM) and Production Project Managers (PPM).
- The goals of the MPS are production efficiency, velocity, and on-time shipment performance to Original Customer Promise (OCP).
- The Master Scheduler works together with the Production Planners to ensure plant loading from the MPS neither under (passing up capacity) or overloads available capacity (causing late deliveries to OCP).
- A “hands-on” approach to monitoring production processes versus the MPS is required – including frequent interactions with Engineering Management, Manufacturing Management, Purchasing Management, Quality Management, and Executive Management.
- Develop and maintain (in IFS) a clear view of plant demand/loading by Work Center (based on current scheduled SO loading and hours in routings).
Active Job
Updated 17 days agoSimilar Job
Relevance
Active