Upvote
Downvote
Industrial Groundsource Geothermal Project Manager
Share Job
- Suggest Revision
- CDM Smith has an exciting opportunity for a Project Manager focused on the siting, design, and construction of networked geothermal heating and cooling systems at the district scale.
- Industrial Groundsource Geothermal Project Manager
- PMP (PMI), CCM or DBIA certification is required (within 12 months of hire or promotion onto the Approved Project Manager list).
- Experience in Geothermal Facility Assessment & Energy Analysis, Vertical Bore field Design, Horizontal Bore field Design, Geothermal Site Planning, Geothermal Bore field Operational Analysis, Infrastructure Master Planning and Life-Cycle Cost Analysis preferred.
- Experience with district heating/cooling and a strong desire to focus on geothermal engineering will be considered in lieu of direct geothermal experience.
Active Job
Updated YesterdaySimilar Job
Relevance
Active