Upvote
Downvote
Construction Scheduler
Share Job
- Suggest Revision
Full-time
- Bristol Bay Construction Holdings LLC is looking for a competent construction scheduler to join our pre-construction team.
- Education:Construction Management or Engineering Bachelor’s Degree preferred.
- Key Responsibilities: Work closely with the pre-construction team to develop schedules using the Critical Path Method (CPM) in Primavera P6.
- Evaluate and identify schedule logic/sequencing and constraints based on discussion with the pre-construction and construction teams.
- Essential Qualifications: Minimum of 10 years’ experience in design build and design bid build projects developing CPM schedules in Primavera P6; federal market preferred.
Active Job
Updated 5 days agoSimilar Job
Relevance
Active