JOBSEARCHER

Project Scheduling Engineer

VariteDenver, COL5 SeniorSeptember 22nd, 2026
Scheduling Engineer
Pay rate: $50-60/Hr on W2 basis. Functioning at a tactical level, the Scheduling Engineer is accountable for the delivery and execution of the end to end integrated schedule development and management processes for all assigned projects. This resource provides leadership and management of the schedule working with the Project Manager, project team, and business leadership. Responsibilities of the position include, but are not limited to, the following: Work closely with project leads and the Cost Engineer on the development of the schedule plan (part of the Project Controls Plan) and lead the execution of the plan Interface with project teams to formulate and develop schedules that fully integrate all phases, functions, and activities Provide guidance and direction to project teams in determining required level of detail, coordination of functions, integration of project phases, and methods/techniques to improve cycle time Develop schedule logic, connectivity, and hierarchy Assist teams in identifying key metrics and benchmarks (internal and external) and ensures they are in place to effectively gauge schedule performance Assess and analyze schedules for quality, reasonableness, and competitiveness throughout the life cycle of the project Work with project teams to define resource loading requirements for the integrated project schedule, resource load the integrated schedule, and identify critical resources issues Perform critical path analyses Perform schedule risk analysis to identify potential issues and voids. Then develop appropriate solutions for risk/deviation mitigation and adjust schedules/execution accordingly Lead schedule status meetings and provide schedule updates based upon required frequency (as per schedule plan) as appropriate Identify and provide schedule reports that are beneficial to the project team Provide guidance and direction to the engineering, design, procurement, and/or construction disciplines in the effective use of the integrated schedule for obtaining physical percent complete and earned value analysis. Work with the Project Cost Engineer to track, analyze, and report physical progress and earned value against the baseline in support of the change management process Provide mentoring and training for project team members in scheduling best practices standardization The following is required for this role: Has experience in and must be able to provide responsibilities outlined above 5+ years of heavy industrial Project scheduling experience for both engineering and construction Proficient user of Primavera (P6) and Microsoft Project scheduling software'sAbility to manage multiple project tasks and quickly initiate changes in plan when appropriate Ability to effectively interact with and influence people at all levels within and outside of company Ability to travel (up to 30%)The following is preferred for this role:10+ years of heavy industrial Project scheduling experience for both engineering and construction Bachelor's degree Technical/Engineering background or experience Familiarity with SAP, industry cost reporting techniques and responsibilities Ability to conduct schedule risk analysis with software such as Acumen or Primavera Risk Analysis Primary Skill: Rodman