JOBSEARCHER

Data Center Tech

Data Center TechFusion Solutions is looking for a Data Center Tech for a client in Fort Lauderdale, FL and Miami, FL. The job requires one day in each market. The pay rate is $40.00/hr for 1099 status. The start date is 07/18 and 07/19 for one job in each city per day. Resources needed: 1. Duration: 1 day work in each market. Fort Lauderdale, FL and Miami, FL (Boca Raton can be the hub for someone). You provide a small amount of Clear Flame-Retardant Heat Shrink. The client provides lugs, power cable, grounding cable, GMT fuses, PTAGs, lacing twine, and fish paper.Scope:Cisco ASR920 router (boca-t-dcn-01r) should have already been installed to Arelion CAB CG12.011.212.11 position RU10Run new and connect DC power cables to 1X 2A/VDC 1A/1B, DC-PNL-2A-CG12.011.212.11.RU35 GMT A3/B3 (GMT 5A fuses with 14-AWG WIRE)Only one DC power supply is available at this time, please leave the second power cable hanging to be connected in a few weeks. We will leave the breaker turned off on the DC Panel for the B Feed and tape up the lugsLabel power cables with A and Z end with P-TagsPower on the device and verify green LEDs are on Arista after chassis is powered up and both power feeds are workingAlign Tx/Rx for the following patches, label with ICB# and A/Z positions ICB-820180 (cat6) [CG12.011]212/11/RU10 boca-t-dcn-01r port 0/22 [CG12.011]212/11/RU22 BOCA/T RLS 01 port WSC-1Checklist:Cables ran correctly?BO fiber cables should be ran on the ladder rack and to the back of the BO ODF. While the duplex fibers are ran in the over-head fiber tray.BO fiber cables should be dressed in using lacing cord and or Velcro, along with fish paper.Do not hide cable slack in the racks/cabinets and it's vertical wire managers; any slack should be put in the over-head fiber tray.All cables should have a nice 90 degree bend from the vertical wire manager to the network device.All cables including power should be labeled at both ends (A and Z location with port information, ICB and or IC #).Install and dress copper cables on ladder rack; copper cables should not be ran in the overhead fiber tray.Tidy up existing fibers (pull up extra slack to the over-head fiber tray, bundle fibers together with Velcro in vertical wire managers and each chassis slot).General site cleanup; throw trash away and make sure all empty boxes are properly removed from the site.Provide pictures to the Implementation Engineer so they can be reviewed.