JOBSEARCHER

Water Catchment: Request for Proposal

We are Girl ScoutsGirl Scouts create the world they want to live in and strive to make it better every single day. They explore their strengths, take on new challenges, and can always be themselves, regardless of background or ability.Supported by adult volunteers and mentors right here in our community, as well as millions of alums around the globe, Girl Scouts lead the way as they discover who they are and how they can make the future a brighter place.Request for Proposals (RFP)Design and Construction of Roof Water Catchment System for Potable Water Supply atCamp Kilohana, Island of Hawai‘iIssued by: Girl Scouts of HawaiiDate Issued: October 13, 2025Proposal Due Date: As soon as possible, with rolling consideration when at least 3 proposalsare received IntroductionGirl Scouts of Hawaii is soliciting proposals from qualified contractors to design, permit, andconstruct a roof-based water catchment system at Camp Kilohana (Baldwin Lodge). Thesystem must provide a reliable source of potable water, meeting state and county healthstandards, and should include recommendations for roof cleaning, gutter installation orimprovements, and maintenance to ensure long-term safety and functionality. Scope of WorkThe Selected Contractor Will Be Responsible For Design Evaluate the existing building roof structure for suitability of catchment. Develop a system design that includes: Roof cleaning and preparation requirements (safe for potable water collection) Gutters, downspouts, and first-flush diverters Catchment tank(s), including appropriate size, location, and foundation Filtration and disinfection system (e.g., sediment filter, UV, chlorination) Pump and plumbing integration with existing water lines (if applicable) Provide stamped design drawings and specifications. Construction & Installation Supply and install all necessary equipment, including gutters, tanks, filters, pumps, andplumbing. Conduct roof cleaning and surface preparation, including any recommended coatings orrepairs. Install or replace gutters to optimize water collection efficiency. Connect system to potable water distribution as needed. Ensure compliance with all building, health, and environmental regulations. Commissioning & Testing Test water quality to verify potability standards are met. Conduct performance testing of pumps, filters, and storage tanks. Provide training for staff on system operation and maintenance. Documentation Provide a full system manual, including maintenance schedule and cleaning guidelines. Deliver warranties for equipment and workmanship. Submit required permits, approvals, and inspection sign-offs. Contractor Qualifications Hold appropriate licenses for plumbing, roofing, and potable water system installation inthe State of Hawaii (or relevant jurisdiction). Demonstrate prior experience with similar potable water catchment projects. Carry appropriate insurance (general liability, workers’ compensation). Proposal Requirements Copy of state licenses. Design concept and technical approach. Recommendations for roof cleaning, gutter work, and ongoing maintenance. Preliminary project timeline. Detailed cost estimate (materials, labor, permits, testing). Any exclusions, warranty and maintenance offerings. Timeline RFP Issued: October 13, 2025 Site Visits: to be arranged with GSH as needed Proposal Deadline: As soon as possible, with rolling consideration when at least 3proposals are received Contractor Selection: As soon as possible, with rolling consideration when at least 3proposals are received Project Start Date: as soon as possible Submission InstructionsSubmit Proposals Electronically ToAmber Richardson, Director of Camp Advancementarichardson@gshawaii.org808-675-5524 Terms & Conditions Girl Scouts of Hawaii reserves the right to reject any or all proposals.Selection is not solely based on lowest bid; qualifications and value will also beconsidered. Contractor must obtain and pay for all necessary permits. Work must comply with NEC, state, and county regulations. All contracts in excess of $10,000 must address termination for cause and forconvenience by the non-Federal entity including the manner by which it will beeffected and the basis for settlement. All contracts must include the equal opportunity clause provided under 41 CFR 60-1.4(b), in accordance with Executive Order 11246, “Equal EmploymentOpportunity” (30 FR 12319, 12935, 3 CFR Part, 1964-1965 Comp., p. 339), asamended by Executive Order 11375, “Amending Executive Order 11246 Relating toEqual Employment Opportunity,” and implementing regulations at 41 CFR part 60,“Office of Federal Contract Compliance Programs, Equal Employment Opportunity,Department of Labor.” All contracts awarded by the non-Federal entity in excess of $100,000 that involvethe employment of mechanics or laborers must include a provision for compliancewith 40 U.S.C. 3702 and 3704, as supplemented by Department of Labor regulations(29 CFR Part 5). Under 40 U.S.C. 3702 of the Act, each contractor must be requiredto compute the wages of every mechanic and laborer on the basis of a standardwork week of 40 hours. Work in excess of the standard work week is permissibleprovided that the worker is compensated at a rate of not less than one and a halftimes the basic rate of pay for all hours worked in excess of 40 hours in the workweek. The requirements of 40 U.S.C. 3704 are applicable to construction work andprovide that no laborer or mechanic must be required to work in surroundings orunder working conditions which are unsanitary, hazardous or dangerous. Theserequirements do not apply to the purchases of supplies or materials or articlesordinarily available on the open market, or contracts for transportation ortransmission of intelligence.