JOBSEARCHER

Technical Program Manager, Data Center Construction

ARCHIVED

We can't find an active application page for this role right now. It may reopen or be listed elsewhere. Use Next Steps to search for an active apply link and similar live jobs.

Technical Program Manager, Design Engineering (MEP) Lead the Next Generation of Hyperscale Data Centers Are you passionate about delivering complex, mission-critical infrastructure that powers the world's largest technology platforms? We're looking for a Technical Program Manager with a strong Mechanical and Electrical Engineering background to lead the delivery of large-scale data center projects from initial design through construction, commissioning, and operational handover. This is an opportunity to own the entire project lifecycle while partnering with engineering, construction, operations, and executive leadership teams to build highly reliable, state-of-the-art facilities. If you thrive in fast-paced environments, enjoy solving complex technical challenges, and want to make a tangible impact on the future of digital infrastructure, we'd love to connect with you.
What You'll Do:
  • As the technical leader for major data center developments, you'll be responsible for ensuring projects are delivered safely, efficiently, and to the highest engineering standards.
  • Project Leadership
  • Lead projects from concept and design through construction, commissioning, energization, and operational turnover
  • Develop and manage project schedules, budgets, and resource plans
  • Identify project risks and drive mitigation strategies to keep projects on track
  • Coordinate contractors, consultants, vendors, and internal stakeholders throughout the project lifecycle
  • Support procurement strategies and evaluate delivery models including EPC, Design-Build, and Construction Management
  • Engineering & Technical Oversight
  • You'll serve as the technical authority across multiple engineering disciplines, ensuring every system is designed and delivered for maximum reliability.
Responsibilities include:
  • Reviewing electrical, mechanical, HVAC, fire protection, security, and IT infrastructure designs
  • Validating redundancy strategies including N+1, 2N, and Tier III+ requirements
  • Coordinating utility interconnections and energization planning
  • Overseeing MV/HV electrical infrastructure and power system studies
  • Driving commissioning strategy and operational readiness
  • Ensuring compliance with industry standards including Uptime, NFPA, IEC, TIA, and ISOCollaboration & Leadership
Success in this role requires someone who enjoys bringing teams together and driving projects forward. You will: Lead multidisciplinary engineering and construction teams Partner with operations to ensure a seamless transition into production Interface with customers, utilities, consultants, and executive leadership Mentor junior engineers and promote technical excellence across the organization Support strategic planning and executive project reporting Operational Readiness You'll play a key role in ensuring every facility is prepared for long-term success by: Overseeing as-built documentation and asset registers Supporting development of SOPs, MOPs, and EOPsValidating maintainability, reliability, and uptime objectives Supporting operations teams through startup and stabilization Monitoring performance metrics including PUE, WUE, and overall system reliability
What We're Looking For:
  • Required Experience
  • Bachelor's degree in Electrical, Mechanical, or Building Services Engineering 10+ years of experience delivering mission-critical or hyperscale data center projects
  • Experience managing projects from design through commissioning and operational handover
  • Strong working knowledge of critical electrical and mechanical infrastructure, including UPS systems, generators, MV/LV distribution, chillers, CRAH/CRAC units, liquid cooling, fire suppression systems, and BMS/SCADA platforms
  • Experience managing EPC, Design-Build, or Construction Management teams
Preferred Qualifications:
  • Experience delivering 50MW+ hyperscale or Tier III+ data center campuses
  • Experience with large-scale utility interconnections and energization planningPMP, CDCP, ATD, or similar professional certifications
  • Master's degree in Engineering, Business Administration, or related discipline
Who You Are: You're a hands-on technical leader who enjoys taking ownership and solving complex challenges. You understand both the engineering details and the bigger picture, and you're comfortable collaborating across design, construction, commercial, and operations teams. You bring:
  • Strong leadership and communication skills
  • Excellent stakeholder management abilities
  • A proactive approach to problem solving
  • Confidence making decisions in fast-paced, high-pressure environments
  • A commitment to delivering safe, reliable, and high-quality infrastructure
  • Why This Opportunity?
This is a chance to play a critical role in delivering next-generation hyperscale infrastructure while working alongside experienced engineering and construction professionals. You'll have the opportunity to influence technical strategy, lead major campus developments, and see your work transition from concept to fully operational facilities that support some of the world's most demanding technology environments. If you're looking for a role with significant ownership, technical depth, and long-term growth potential, we'd love to hear from you.