JOBSEARCHER

Frontend Engineer

ARCHIVED

We can't find an active application page for this role right now. It may reopen or be listed elsewhere. Use Next Steps to search for an active apply link and similar live jobs.

Bobyard Software Engineering San Francisco, CA, USAUSD 130k-160k / year + EquityPosted on Aug 12, 2026 About Bobyard Bobyard builds AI systems that automate takeoffs for contractors, saving them dozens of hours per project in a multi-trillion industry still running on spreadsheets and guesswork. Contractors live in our product all day — the interface has to be fast, precise, and obvious. We're Series A, backed by 8VC, Primary, and Pear, and growing fast.
About The Role: You'll work on the hardest UI problem we have: rendering large construction drawings and dense estimate tables without friction. Think canvas rendering, pan/zoom performance, and tables with hundreds of rows that still feel instant. You don't need prior experience with canvas or data-dense interfaces — you need strong React/TypeScript fundamentals, real product taste, and to be a fast learner ready to go deep on a problem most junior roles never touch. You don't need to check every box below — if the hard problem excites you, apply.
What You'll Do:
  • Build and ship core product UI in React and TypeScriptTurn rough product direction and designs into polished, production-ready interfaces
  • Work on frontend performance — fast loads, smooth interactions, responsive rendering of large drawings and data-dense tables
  • Contribute to a reusable component library the team ships onWork directly with product and design to shape features, not just implement them
  • Prototype quickly, gather feedback, and iterate toward the right UXDiagnose and fix frontend bugs, rendering issues, and state management problems
What We're Looking For:
  • Strong React and modern CSS skills — you can build complex layouts and interactions without reaching for a library every time
  • Real design sense — you notice when spacing, hierarchy, or motion is off, and you fix it without being asked
  • Comfortable working from rough product direction — can fill the gap between a mock and a shippable feature
  • Fluent in TypeScript, component architecture, and frontend state management
  • High ownership mindset — you don't wait to be told what to fix
  • Fast learner who can navigate unfamiliar systems and tools quickly
  • Bachelor's degree in Computer Science or a related field, or equivalent practical experience
Nice to have: Experience with data-dense or canvas-heavy interfaces (tables, editors, drawing tools) Personal projects or open-source work involving performance-sensitive UIExposure to construction, real estate, or other "boring industry, real problem" domains
What We Offer:
  • $130,000–$160,000 base salary, based on experience 0.02%–0.04% equity (4-year vest)
  • Full-time, in-person role in the SF Bay Area
  • A genuinely hard, high-ownership problem from day one
Comp Philosophy We are proud to offer competitive, top-of-market compensation because we want to celebrate the dedicated people who ship amazing work and drive our success. Our individual compensation is thoughtfully tailored based on your role, experience, and contributions, alongside performance-based rewards. See more open positions at Bobyard