Upvote
Downvote
Traffic Sign Tech I - III DOQ
Share Job
- Suggest Revision
- This classification assists with traffic sign, pavement marking and related traffic control work.
- e., power posthole diggers, power post-drivers, impact wrenches, and assorted other hand and power tools required for job; operates heat vacuum machines, drill presses, band saws and die cutting machines, as necessary.
- Operates or assists in the operation of thermoplastic pavement marking equipment.
- TECH I: Minimum of six (6) months experience in sign installation, fabrication, pavement marking and striping is desired but not required.
- TECH II: Minimum of one (1) year of experience in sign installation, fabrication, pavement marking and striping.
Active Job
Updated 2 days agoSimilar Job
Relevance
Active