Upvote
Downvote
Shipper Act
Share Job
- Suggest Revision
- Dismantle transformer for shipment (arrestors, radiators, bushings, conservators, etc.)
- Drain oil, vacuum fill with dry air, nitrogen or oil as required and pressure test transformer tank.
- Package components and transformer parts for shipment
- Prepare railroad car and/or truck for loading transformer unit and components
- Utilize portable scaffold and steps, ladders, radial and band saw, vacuum cleaner, hydraulic jacks, threading machine, hi-press crimpers, grinder, stud gun, hand drill, pneumatic wrenches, mallet, sledge, pry bars, blocks, wire stripper, hand crimper, overhead jib crane, chains, slings, vacuum pumps, forklift truck, air bearings
Active Job
Updated 6 days agoSimilar Job
Relevance
Active