Upvote
Downvote
Integration Tech III - B Shift
Share Job
- Suggest Revision
$40 - $46 an hour
- B shift: Monday - Friday 2pm - 10:30pm
- Manufacture, assemble, and test New Glenn (GS1) First Stage & Second Stage structure.
- Operate various material handling equipment including forklifts, overhead cranes, aerial lifts, flight vehicle and subassembly transportation equipment, truck-trailer combinations and other ground support equipment as required.
- Setup and operate a wide range of precision calibrated tools including, but not limited to, torque wrenches, micrometers, callipers, laser tracker, height gauges and optical measuring instruments.
- Perform routine maintenance functions such as daily clean-up of work areas to support 5S, FOD, and ESD
Active Job
Updated TodaySimilar Job
Relevance
Active