Upvote
Downvote
HSE Specialist III
Share Job
- Suggest Revision
- 2025 – 2027 - WOC North Slope Installation and Commissioning
- 2027 – 2029 – WCF / DS North Slope Installation and Commissioning
- Willow will be a greenfield design including all processing facilities, utilities, drilling equipment, camp, and power generation.
- Work scopes are primarily focused on ice roads, temporary infrastructure, gravel hauling operations, commissioning, facility module installation and operation, and pipeline installation.
- Work location will be on the North Slope with an office and lodging at a large field camp, typical work shifts are either 2 x 2 or 3 x 3.
Active Job
Updated TodaySimilar Job
Relevance
Active