Full-time
- Utilizes Timberline to prepare or assists in preparation of Opinions of Probable Cost of Construction (OPCC) and design build projects.
- Works with project controls team to update the project schedule with actual progress including changing durations or logic ties as necessary to manage the critical path.
- Work with the project manager and project controls team to develop Time Impact Analysis (TIA) schedules for use in change management.
- Maintains and updates Quality Assurance/Quality Control (QA/QC) reporting for project sites.
- Works with project manager and VDC team to develop project capability needs and VDC Plan. Deploys and supports construction technology and virtual design application on appropriate project sites.