{"schemaVersion":"jobsearcher.job.v1","id":"d1e9756acdd87e2d890c7ba2","url":"https://jobsearcher.com/jobs/d1e9756acdd87e2d890c7ba2","canonicalUrl":"https://jobsearcher.com/jobs/d1e9756acdd87e2d890c7ba2","title":"Project Scheduling Engineer","description":"Scheduling EngineerPay rate: $50-60/Hr on W2 basis. Functioning at a tactical level, the Scheduling Engineer is accountable for the delivery and execution of the end to end integrated schedule development and management processes for all assigned projects. This resource provides leadership and management of the schedule working with the Project Manager, project team, and business leadership.Responsibilities of the position include, but are not limited to, the following:Work closely with project leads and the Cost Engineer on the development of the schedule plan (part of the Project Controls Plan) and lead the execution of the planInterface with project teams to formulate and develop schedules that fully integrate all phases, functions, and activitiesProvide guidance and direction to project teams in determining required level of detail, coordination of functions, integration of project phases, and methods/techniques to improve cycle timeDevelop schedule logic, connectivity, and hierarchyAssist teams in identifying key metrics and benchmarks (internal and external) and ensures they are in place to effectively gauge schedule performanceAssess and analyze schedules for quality, reasonableness, and competitiveness throughout the life cycle of the projectWork with project teams to define resource loading requirements for the integrated project schedule, resource load the integrated schedule, and identify critical resources issuesPerform critical path analysesPerform schedule risk analysis to identify potential issues and voids. Then develop appropriate solutions for risk/deviation mitigation and adjust schedules/execution accordinglyLead schedule status meetings and provide schedule updates based upon required frequency (as per schedule plan) as appropriateIdentify and provide schedule reports that are beneficial to the project teamProvide guidance and direction to the engineering, design, procurement, and/or construction disciplines in the effective use of the integrated schedule for obtaining physical percent complete and earned value analysis.Work with the Project Cost Engineer to track, analyze, and report physical progress and earned value against the baseline in support of the change management processProvide mentoring and training for project team members in scheduling best practices standardizationThe following is required for this role:Has experience in and must be able to provide responsibilities outlined above5+ years of heavy industrial Project scheduling experience for both engineering and constructionProficient user of Primavera (P6) and Microsoft Project scheduling software'sAbility to manage multiple project tasks and quickly initiate changes in plan when appropriateAbility to effectively interact with and influence people at all levels within and outside of companyAbility to travel (up to 30%)The following is preferred for this role:10+ years of heavy industrial Project scheduling experience for both engineering and constructionBachelor's degreeTechnical/Engineering background or experienceFamiliarity with SAP, industry cost reporting techniques and responsibilitiesAbility to conduct schedule risk analysis with software such as Acumen or Primavera Risk AnalysisPrimary Skill: Rodman","company":"Varite","rawCompany":"varite","city":"Denver","state":"CO","isRemote":false,"isActive":false,"createdAt":"2026-09-22T13:31:45.096Z","occupations":[{"code":"13-1082.00","title":"Project Management Specialists","slug":"project-management-specialists"},{"code":"11-9041.00","title":"Architectural and Engineering Managers","slug":"architectural-and-engineering-managers"},{"code":"11-9021.00","title":"Construction Managers","slug":"construction-managers"}],"industries":[{"code":"237990","title":"Other Heavy and Civil Engineering Construction","slug":"other-heavy-and-civil-engineering-construction"},{"code":"541330","title":"Engineering Services","slug":"engineering-services"},{"code":"237310","title":"Highway, Street, and Bridge Construction","slug":"highway-street-and-bridge-construction"}],"jobPosting":{"@context":"https://schema.org","@type":"JobPosting","title":"Project Scheduling Engineer","description":"Scheduling EngineerPay rate: $50-60/Hr on W2 basis. Functioning at a tactical level, the Scheduling Engineer is accountable for the delivery and execution of the end to end integrated schedule development and management processes for all assigned projects. This resource provides leadership and management of the schedule working with the Project Manager, project team, and business leadership.Responsibilities of the position include, but are not limited to, the following:Work closely with project leads and the Cost Engineer on the development of the schedule plan (part of the Project Controls Plan) and lead the execution of the planInterface with project teams to formulate and develop schedules that fully integrate all phases, functions, and activitiesProvide guidance and direction to project teams in determining required level of detail, coordination of functions, integration of project phases, and methods/techniques to improve cycle timeDevelop schedule logic, connectivity, and hierarchyAssist teams in identifying key metrics and benchmarks (internal and external) and ensures they are in place to effectively gauge schedule performanceAssess and analyze schedules for quality, reasonableness, and competitiveness throughout the life cycle of the projectWork with project teams to define resource loading requirements for the integrated project schedule, resource load the integrated schedule, and identify critical resources issuesPerform critical path analysesPerform schedule risk analysis to identify potential issues and voids. Then develop appropriate solutions for risk/deviation mitigation and adjust schedules/execution accordinglyLead schedule status meetings and provide schedule updates based upon required frequency (as per schedule plan) as appropriateIdentify and provide schedule reports that are beneficial to the project teamProvide guidance and direction to the engineering, design, procurement, and/or construction disciplines in the effective use of the integrated schedule for obtaining physical percent complete and earned value analysis.Work with the Project Cost Engineer to track, analyze, and report physical progress and earned value against the baseline in support of the change management processProvide mentoring and training for project team members in scheduling best practices standardizationThe following is required for this role:Has experience in and must be able to provide responsibilities outlined above5+ years of heavy industrial Project scheduling experience for both engineering and constructionProficient user of Primavera (P6) and Microsoft Project scheduling software'sAbility to manage multiple project tasks and quickly initiate changes in plan when appropriateAbility to effectively interact with and influence people at all levels within and outside of companyAbility to travel (up to 30%)The following is preferred for this role:10+ years of heavy industrial Project scheduling experience for both engineering and constructionBachelor's degreeTechnical/Engineering background or experienceFamiliarity with SAP, industry cost reporting techniques and responsibilitiesAbility to conduct schedule risk analysis with software such as Acumen or Primavera Risk AnalysisPrimary Skill: Rodman","datePosted":"2026-09-22T13:31:45.096Z","dateModified":"2026-09-22T13:31:45.096Z","hiringOrganization":{"@type":"Organization","name":"Varite","sameAs":"https://jobsearcher.com"},"jobLocation":{"@type":"Place","address":{"@type":"PostalAddress","addressLocality":"Denver","addressRegion":"CO","addressCountry":"US"}},"identifier":{"@type":"PropertyValue","name":"JobSearcher","value":"d1e9756acdd87e2d890c7ba2"},"url":"https://jobsearcher.com/jobs/d1e9756acdd87e2d890c7ba2"}}