{"schemaVersion":"jobsearcher.job.v1","id":"24d04e6e942fa8bfa9334dae","url":"https://jobsearcher.com/jobs/24d04e6e942fa8bfa9334dae","canonicalUrl":"https://jobsearcher.com/jobs/24d04e6e942fa8bfa9334dae","title":"PIPE LAYER","description":"INTRODUCTION\nThe purpose of this Value Practice is to establish and define the functional role, position requirements, reporting relationships, authority, responsibilities, duties and measurements of performance for the Pipelayer position at BDZ Construction. The job description is the minimum expectations of performance and does not constitute an exhaustive list. As such, position requirements, responsibilities, and duties may change or be added at any time as is required by the business.\nFUNCTIONAL ROLE\nThe basic function of the Pipelayer is to lead the pipe laying operations of the company and complete these jobs on time and within scope.\nREPORTING RELATIONSHIPS\nReports to: Site or Crew Foreman\nReporting to this position: Top Man\nWORKING CONDITIONS\nTime will be spent in a field construction environment without controlled temperature.\nNormal business hours are typically Monday-Friday, 7:00 AM 5:00 PM or as necessary to perform the required functions.\nAUTHORITIES AND RESPONSIBILITIES\nThe Pipelayer is given the necessary authority to do the day-to-day operations asked of them on the job without direct supervision or direction.\nDUTIES AND TASKS\nRead and understand plans on a master level.\nUse the pipe saw/cutoff saw to mold the pipe on a master level.\nBe able to use all required small hand tools on a master level.\nOther duties assigned as needed in the field.\nMEASURES OF PERFORMANCE\nConsistently meets company pipe laying production standards.\nPipe quality passes 100% of the tests required by municipalities.\nFollow directions from Foreman and other senior staff.\nREQUIREMENTS\nTo perform this job successfully, an individual must be able to complete all areas outlined for this position in a satisfactory manner. Listed below are representative of the knowledge, skills, and/or abilities necessary to meet the minimum job requirements. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.\nEducation:\nPreferred: High School Diploma or GED\nLicensing or Certification:\nPreferred: CPR and First Aid; Valid Drivers License; OHSA Confined Space and Trench Safety\nExperience:\nRequired: 2-yrs mainline pipe laying experience\nPhysical\nRequired: Ability to lift and move objects of at least 100lbs. Ability to climb ladders. Ability to bend over, sit on knees, and otherwise move in awkward positions as may be necessary to check, measure, and do the work.\nTools / Equipment\nCompany Provided: The company will provide each Pipelayer with a job-related tools. These will be assigned to and signed out by the Foreman.","company":"Bdz Construction","rawCompany":"bdz construction","city":"Bothell","state":"WA","isRemote":false,"isActive":false,"createdAt":"2026-04-12T20:19:23.564Z","occupations":[{"code":"47-2151.00","title":"Pipelayers","slug":"pipelayers"},{"code":"47-3015.00","title":"Helpers--Pipelayers, Plumbers, Pipefitters, and Steamfitters","slug":"helpers-pipelayers-plumbers-pipefitters-and-steamfitters"},{"code":"47-2152.00","title":"Plumbers, Pipefitters, and Steamfitters","slug":"plumbers-pipefitters-and-steamfitters"}],"industries":[{"code":"237110","title":"Water and Sewer Line and Related Structures Construction","slug":"water-and-sewer-line-and-related-structures-construction"},{"code":"237990","title":"Other Heavy and Civil Engineering Construction","slug":"other-heavy-and-civil-engineering-construction"},{"code":"238220","title":"Plumbing, Heating, and Air-Conditioning Contractors","slug":"plumbing-heating-and-air-conditioning-contractors"}],"jobPosting":{"@context":"https://schema.org","@type":"JobPosting","title":"PIPE LAYER","description":"INTRODUCTION\nThe purpose of this Value Practice is to establish and define the functional role, position requirements, reporting relationships, authority, responsibilities, duties and measurements of performance for the Pipelayer position at BDZ Construction. The job description is the minimum expectations of performance and does not constitute an exhaustive list. As such, position requirements, responsibilities, and duties may change or be added at any time as is required by the business.\nFUNCTIONAL ROLE\nThe basic function of the Pipelayer is to lead the pipe laying operations of the company and complete these jobs on time and within scope.\nREPORTING RELATIONSHIPS\nReports to: Site or Crew Foreman\nReporting to this position: Top Man\nWORKING CONDITIONS\nTime will be spent in a field construction environment without controlled temperature.\nNormal business hours are typically Monday-Friday, 7:00 AM 5:00 PM or as necessary to perform the required functions.\nAUTHORITIES AND RESPONSIBILITIES\nThe Pipelayer is given the necessary authority to do the day-to-day operations asked of them on the job without direct supervision or direction.\nDUTIES AND TASKS\nRead and understand plans on a master level.\nUse the pipe saw/cutoff saw to mold the pipe on a master level.\nBe able to use all required small hand tools on a master level.\nOther duties assigned as needed in the field.\nMEASURES OF PERFORMANCE\nConsistently meets company pipe laying production standards.\nPipe quality passes 100% of the tests required by municipalities.\nFollow directions from Foreman and other senior staff.\nREQUIREMENTS\nTo perform this job successfully, an individual must be able to complete all areas outlined for this position in a satisfactory manner. Listed below are representative of the knowledge, skills, and/or abilities necessary to meet the minimum job requirements. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.\nEducation:\nPreferred: High School Diploma or GED\nLicensing or Certification:\nPreferred: CPR and First Aid; Valid Drivers License; OHSA Confined Space and Trench Safety\nExperience:\nRequired: 2-yrs mainline pipe laying experience\nPhysical\nRequired: Ability to lift and move objects of at least 100lbs. Ability to climb ladders. Ability to bend over, sit on knees, and otherwise move in awkward positions as may be necessary to check, measure, and do the work.\nTools / Equipment\nCompany Provided: The company will provide each Pipelayer with a job-related tools. These will be assigned to and signed out by the Foreman.","datePosted":"2026-04-12T20:19:23.564Z","dateModified":"2026-04-12T20:19:23.564Z","hiringOrganization":{"@type":"Organization","name":"Bdz Construction","sameAs":"https://jobsearcher.com"},"jobLocation":{"@type":"Place","address":{"@type":"PostalAddress","addressLocality":"Bothell","addressRegion":"WA","addressCountry":"US"}},"identifier":{"@type":"PropertyValue","name":"JobSearcher","value":"24d04e6e942fa8bfa9334dae"},"url":"https://jobsearcher.com/jobs/24d04e6e942fa8bfa9334dae"}}