Upvote
Downvote
Water Treatment Technical Lead
Share Job
- Suggest Revision
Full-time
- Our Water/Wastewater team serves the essential Municipal and Industrial clients throughout the entire US and are comprised of employee owners in Sioux Falls, Storm Lake, Des Moines, and St. Louis Park offices.
- Our Water/Wastewater Practice Group Leader is Casey Patton, based in Des Moines.
- Clarion Water Treatment Plant : The City of Clarion contracted with ISG to assist them with the planning, design, and construction of a new reverse osmosis water treatment plant capable of producing approximately 1 million gallons of water per day.
- The reverse osmosis system includes the membranes as well as pressure filters, holding tanks, transfer pumps and chemical feed systems necessary for the proper treatment of the water.
- The City of Rockwell City contracted with ISG to assist them with the planning, design, and construction of improvements to their existing water reclamation facility to provide for the treatment of a daily average of 350,000 gallons of sewage, with a total capacity to handle up to 3.8 million gallons of sewage per day during a wet weather event.
Active Job
Updated 11 days agoSimilar Job
Relevance
Active